DLDS-1214B Electrical Installation Training System of vocational education equipment
- Dolang
- China
- 30-60DAYS
(1) Adopt the actual building structure, isolate each room, close to the work site, and also fully comply with the guiding ideology and knowledge points of the World Skills Competition;
(2) Use a mesh board and a wooden mounting board structure for installation. The wooden board is installed on the mesh board, which is fully in line with the equipment used in the World Skills Competition; features: a. The equipment fully meets the architectural standards; b. The use of wooden boards for students Install closer to the wall; c. The mesh plate structure increases the flexibility of the equipment and facilitates training and teaching after the competition; d. The room adopts a trapezoidal open structure, which is completely consistent with the world skills competition environment, so that students can In the three-dimensional space, it is convenient to complete the installation of different circuits and master various installation techniques; e. In order to facilitate training and simulation testing, the mesh plate and template double-layer structure are used. The mesh plate is used for training, which can be reused and easy to operate. ; The use of wooden boards during skill assessment can simulate the real competition environment.
DLDS-1214B Electrical Installation Training System of vocational education equipment
Equipment Overview
(1) Adopt the actual building structure, isolate each room, close to the work site, and also fully comply with the guiding ideology and knowledge points of the World Skills Competition;
(2) Use a mesh board and a wooden mounting board structure for installation. The wooden board is installed on the mesh board, which is fully in line with the equipment used in the World Skills Competition; features: a. The equipment fully meets the architectural standards; b. The use of wooden boards for students Install closer to the wall; c. The mesh plate structure increases the flexibility of the equipment and facilitates training and teaching after the competition; d. The room adopts a trapezoidal open structure, which is completely consistent with the world skills competition environment, so that students can In the three-dimensional space, it is convenient to complete the installation of different circuits and master various installation techniques; e. In order to facilitate training and simulation testing, the mesh plate and template double-layer structure are used. The mesh plate is used for training, which can be reused and easy to operate. ; The use of wooden boards during skill assessment can simulate the real competition environment.
Technical Parameters
1. Dimensions: a trapezoidal structure, the outer layer is constructed of mesh panels, and the inner layer is composed of four simulated walls
1.1 Left-hand panel (A)/1220mm x 2440 x18 mm
1.2 Right-hand panel (B)/1220mm x 2440 x18 mm
• Main panel (C)/1800mm x 2440 x 18mm
• Ceiling (D) / front 2426mm, rear 1827 mm, depth: 1202 mm
2. Operation desk and tool cabinet
Console: 1600(L)X700(W)X750(H)
Provide operators with an operating platform to avoid interference from various factors, facilitate operation, ensure the safety of operators, and ensure the completion of tasks plays a key role.
Tool Cabinet:
Ensure the safety of operators' tools and facilitate the storage of operators' tools.
3. Power supply: AC380V 50HZ/60HZ three-phase five-wire wire system, output power terminal
Training Content
According to the project teaching, mainly complete the following tasks:
Basic electrical installation skills training
Training on the use of installation tools
Training on the use of testing equipment
Manual pipe bender processing PVC pipe elbow training
PVC pipe and metal pipe cutting training
Connection training of plastic wire tube and plastic junction box
Pipe clamp fixing training
Ming piping into box training
Shaped bending training of exposed tube
Line tube dark application and fixation training
Embedded iron parts or expansion bolt training
Bridge support, suspension, bracket production and installation training
Operation training of threading in the tube
Single (multiple) core copper and aluminum conductor connection training
Indoor lighting and power distribution
Socket and a switch to control a lamp (incandescent lamp, fluorescent lamp, two-pole leakage switch)
Two double switches control one lamp (incandescent lamp, fluorescent lamp, two-pole leakage switch)
Three switches control one lamp (incandescent lamp, fluorescent lamp, two-pole leakage switch)
Wiring of fluorescent lamp circuit
Voice control switch controls the wiring of the incandescent lamp circuit
Touch the delay switch to control the wiring of the incandescent lamp circuit
Human body induction switch controls the wiring of the incandescent lamp circuit
Electrical control
Asynchronous motor jog control circuit
Two-place control circuit of asynchronous motor
Asynchronous motor interlocking forward and reverse control circuit
Double interlock control circuit
Automatic sequence control circuit
Three-phase asynchronous motor manual sequence start
Asynchronous motor Y-Δ control circuit
Button interlocking three-phase asynchronous motor forward and reverse control circuit
Contactor interlocking three-phase asynchronous motor forward and reverse control circuit
Double interlocking three-phase asynchronous motor forward and reverse control circuit
One-way decompression start and reverse brake control circuit
Asynchronous motor reverse connection brake control circuit
Automatic shuttle control circuit
Forward and reverse jog, start control circuit
Automatic reciprocating control circuit with jog
Self-locking control circuit of asynchronous motor
Asynchronous motor unidirectional jog and start control circuit
Control circuit for contactor to control two-speed motor
Time relay to control the control circuit of two-speed motor
PLC electrical control and machine tool circuit transformation
PLC controlled three-phase squirrel cage asynchronous motor jog control and self-locking circuit
PLC controlled three-phase squirrel cage asynchronous motor with delay forward and reverse circuit
PLC-controlled three-phase squirrel cage asynchronous motor interlocking forward and reverse circuit
PLC-controlled three-phase squirrel-cage asynchronous motor Y/Δ switching start circuit
Three-phase squirrel-cage asynchronous motor controlled by PLC reversely connects the brake circuit
PLC controlled automatic shuttle circuit
PLC controlled two start and stop circuits
PLC-controlled three-phase squirrel-cage asynchronous motor sequence starting circuit
Electric circuit of electric hoist controlled by PLC
Comprehensive application of PLC, inverter and touch screen
Inverter function parameter setting and operation
Inverter stepless speed regulation
Inverter control motor forward and reverse
External terminal jog control
Multi-speed selection frequency conversion speed regulation
External analog quantity (voltage/current) frequency conversion speed regulation
Instantaneous power failure start control
PID frequency conversion speed control
PLC object training (stepping motor positioning, etc.)
PLC controls the motor forward and reverse rotation of the external terminal of the inverter
PLC-based program operation control
Frequency conversion open loop speed regulation based on PLC analog control
Open loop speed regulation of frequency converter based on PLC communication mode
Speed closed-loop positioning control based on PLC communication
Inverter closed loop speed regulation based on PLC analog quantity
PLC and man-machine interface touch screen communication control
PLC, man-machine interface touch screen and inverter communication control
PLC and man-machine interface touch screen digital speed control
PLC and man-machine interface touch screen analog speed control
Comprehensive maintenance training for electrical equipment
C6140 type lathe electrical circuit operation training
Detection and Maintenance of Circuit Breakdown of C6140 Lathe
X62W universal milling machine electrical circuit operation training
X62W universal milling machine circuit fault detection and maintenance
FAQ
Q1. What other services can Dolang provide besides teachingequipment?
Answer: Curriculum standard, teacher courseware (PPT), teaching equipment training list, examination question bank, classroom task list, students' books (learning materials), teaching software, etc
Q2. What kind of certification?
Three system certification ISO9000, ISO14001, OHSMS28001; CE certification, SGS certification and Dolang are gold medal members of worlddidac.
Q3. What can Dolang do for our teachers?
Answer: a) Dolang group has Shandong Dolang vocational school, which is specially responsible for the training of teachers. Our national teacher training courses and provincial teacher training courses all cooperate with Dolang school;
B) Dolang has a large number of Chinese vocational college resources, which can also be used for teacher training in your country.
Q4. What kinds of training methods will Dolang provide?
1. We supply you detailed manual books, video and online training service.
2. We supply you training at site, we can send engineer to your place for training
3. You can send your people come to Dolang for training.