DLWD-DJB02 motor training kits Motor Transformer Maintenance and testing training system

  • DLWD-DJB02 motor training kits Motor Transformer Maintenance and testing training system
DLWD-DJB02 motor training kits Motor Transformer Maintenance and testing training system
  • Dolang
  • China
  • 30-60DAYS

●DLWD-DJB02 Motor Transformer Maintenance and Test Training System is the traning platform for remove,rewind,assembling,test,data analysis and other skills training of single-phase transformers,single-phase capacitor induction motor,three-phase squirrel cage induction motor and separately excited DC motor etc.
● The equipment is equipped with three-phase AC adjustable power supply, DC power supply, DC measurement instrument, AC measurment instrument & digital multi-function wattmeter,Motor power supply and test instrument. Beside the above instruments, there are motor inserting tools, Manual digital winding counter.

DLWD-DJB02 motor training kits Motor Transformer Maintenance and testing training system

Equipment Overview

●DLWD-DJB02 motor training kits Motor Transformer Maintenance and testing training system is the traning platform for remove,rewind,assembling,test,data analysis and other skills training of single-phase transformers,single-phase capacitor induction motor,three-phase squirrel cage induction motor and separately excited DC motor etc.

● The equipment is equipped with three-phase AC adjustable power supply, DC power supply, DC measurement instrument, AC measurment instrument & digital multi-function wattmeter,Motor power supply and test instrument. Beside the above instruments, there are motor inserting tools, Manual digital winding counter.


Technical Parameters

● Total dimension : 1950×700×1500mm

● Input power : three-phase,five-wire 380V±10%   50Hz/60Hz

● Output power : leakage protection(action current≤ 30mA), overcurrent protection,fuse protection, AC220V safety terminal isolation output, AC24V safety terminals isolation output,DC220V safety terminals isolation output 

● Capacity : < 1.5KVA


Training 
Content

1. Training project of training module

(1) Training on the use of power box modules

(2) Training on the use of DC measuring instrument module

(3) Training on the use of AC measuring instrument module

(4) Training on the use of adjustable resistance modules

(5) Training on the use of load modules

(6) Tool use training

2. Transformer training project

(1) Transformer data measurement and calculation

(2) Disassembly of transformer winding

(3) Winding of transformer coil

(4) Assembly of transformer

(5) Measurement of transformer insulation resistance

(6) Measurement of transformer DC resistance

(7) Transformation ratio experiment of transformer

(8) No-load test of transformer

(9) Short-circuit test of transformer

(10) Judgment of the end of the transformer with the same name

(11) Measurement and training of transformer external characteristics and voltage regulation rate

(12) Three-phase transformer connection group determination training

3. Single-phase capacitor asynchronous motor training project

(1) Data measurement and calculation of single-phase capacitor asynchronous motor

(2) Disassembly of single-phase capacitor asynchronous motor

(3) Winding of single-phase capacitor asynchronous motor

(4) Wire embedding of single-phase capacitor asynchronous motor

(5) Assembly of single-phase capacitor asynchronous motor

(6) Measurement of insulation resistance of single-phase capacitor asynchronous motor

(7) Measurement of DC resistance of single-phase capacitor asynchronous motor

(8) No-load test of single-phase capacitor asynchronous motor

(9) No-load performance measurement training of single-phase asynchronous motor

(10) Training on measurement of stator resistance, phase-to-phase insulation resistance and ground insulation resistance of single-phase asynchronous motors

4. Three-phase asynchronous motor training project

(1) Data recording and calculation of three-phase asynchronous motor

(2) Disassembly of three-phase asynchronous motor

(3) Winding of three-phase asynchronous motor

(4) Assembly of three-phase asynchronous motor

(5) Measurement of insulation resistance of three-phase asynchronous motor

(6) Measurement of DC resistance of three-phase asynchronous motor

(7) Judgment of the head and end of the three-phase asynchronous motor

(8) No-load test of three-phase asynchronous motor

(9) Three-phase asynchronous motor stator resistance, phase-to-phase insulation resistance and ground insulation resistance measurement training

(10) Three-phase asynchronous motor no-load performance measurement training

 

FAQ

Q1. What other services can Dolang provide besides teachingequipment?

Answer: Curriculum standard, teacher courseware (PPT), teaching equipment training list, examination question bank, classroom task list, students' books (learning materials), teaching software, etc

Q2. What kind of certification?

Three system certification ISO9000, ISO14001, OHSMS28001; CE certification, SGS certification and Dolang are gold medal members of worlddidac.

Q3. What can Dolang do for our teachers?

Answer: a) Dolang group has Shandong Dolang vocational school, which is specially responsible for the training of teachers. Our national teacher training courses and provincial teacher training courses all cooperate with Dolang school;

B) Dolang has a large number of Chinese vocational college resources, which can also be used for teacher training in your country.

Q4. What kinds of training methods will Dolang provide?

1. We supply you detailed manual books, video and online training service.

2. We supply you training at site, we can send engineer to your place for training

3. You can send your people come to Dolang for training.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right